REVIEW-Straughan East End Survey 2026 | Map 1 of 15 Jeffery Holley | Preservation, Inc. Record revised September 9, 2026 ONE PROPERTY RECORD All 10 assigned photographs remain together in this folder. Front, side, rear, and accessory views inform the architectural description as a single property record. FILES architectural-description.txt follows the September 9 prompt and revised application approved through the 701 E Jefferson example. photo-checklist.csv retains original and delivered filenames, captions, direction, GPS, capture time, checksum, selection, and review fields. The renamed JPEGs preserve the original image bytes and embedded metadata. DIRECTIONS Principal façade: southeast toward N Straughan Avenue. Lot position: corner-reaching group; individual lot positions not evident. Filename compass labels describe camera-facing direction. They do not describe façade direction. GPS locates the photographer rather than a building or parcel centroid. REVIEW Reconcile photographed 223 with map 217/219/221; confirm building, parcel, unit and carport divisions and construction date. Contribution: Pending documented review. Construction date: unknown date. Material identification is visual unless otherwise stated. Visible form is described directly; original fabric and construction chronology are not assumed. Candidate filenames preserve the original assignment trail. Updated evidence and association status are recorded in the checklist. A candidate filename is not itself a new uncertainty or a final parcel determination. CHECKLIST USE Use approved_address and reviewer_note for review decisions. Relative paths are measured from the Map-01-By-Address folder. Feature Count is a numeric working count of identified physical resources; configuration notes explain provisional counts and unresolved attachment. It is not a count of legal dwelling units.